A Trip to the Think[box] -- Pre-Project -- January 27th, 2023
(Writing about a week late)
The Friday before last Ben and I went down to the Think[box] after school to look at some of the facilities and maybe get scheduled to do some training. Earlier that morning we had checked on the Think[box] website for training availability, but, despite opening that morning at 12am, they had been booked for the entire month. Mr. D gave us some contacts (Ainsley and Ian) to get in touch with when we arrived. We drove down, parked, and got surprisingly easy access to the facilities. Once we were inside we asked one of the lab techs whether Ainsley or Ian was available, and after waiting a while and exploring some of the available equipment, Ainsley came up to meet us. She told us that while she wasn't in charge of the training schedule for the 4th-floor equipment, she could show us who was. We went up to meet Misha Villanueva (who left early that day so we didn't see him), and eventually, we met Jason Bradshaw, who played a supervisory role on that floor. We told him about our rough, fuzzy vision of a scaled-down turbofan jet engine, and, understandably, he chuckled a little bit, but after we told him that we were hoping to get trained 4 months in advance, his view seemed to shift. We chatted a little bit about training, and he gave us his and Misha's business cards to schedule some training later on. He told us waterjet training usually takes about half an hour, but welding will take a full three hours.
Comments
Post a Comment